• Client: Stanhope
  • Architect: Morris + Company
  • Duration: Completed
  • Location: London
  • Precast Concrete
  • Uniseries Porcelain Tiles
  • Fragments bespoke mix terrazzo tiles
  • Azure Marino Granite
  • Ariz Silver Grey Granite
  • Screeding
  • Use of off-site manufacturing
  • 406 precast concrete panels
  • 800m² terrazzo tiling
  • 900m² porcelain tiling
  • 170m² granite flooring
  • 660m² screeding

Completed in 2022, Vetter UK were responsible for the delivery of the external precast concrete cladding, internal tiling and screeding packages.

Cladding

The installation of 406 precast concrete punch panels that form the external façade of the building, all of which were manufactured by sister company Explore Manufacturing at the Centre of Excellence for Modern Construction.

Tiling

The supply and installation of 800m² of Italian terrazzo tiling to the lift lobbies and reception area, 900m² of porcelain tiling to toilets on all levels and the shower area on the ground floor, 170m² of granite flooring inclusive of granite setts from Portugal and pavers from Spain, as well as 660m² of screeding.